MnDOT intends to reconstruct four blocks of US Highway 12 and MN Hwy 22 through downtown Litchfield from Commercial Street to 4th Street.
This project is planned for 2019 and includes the reconstruction of the existing roadway and sidewalks from building face to building face.
Prior to construction, MnDOT is asking for public feedback as part of the US 12 Downtown Litchfield Study.
Date and Time
Tuesday Feb 16, 2016
4:00 PM - 6:00 PM CST
Tuesday, February 16, 2016
4:00 p.m. to 6:00 p.m.
Location
The Sweet Depot - Lobby Area
207 N. Sibley Avenue
Downtown Litchfield